Index: 2_topo.html =================================================================== --- 2_topo.html (revision 893) +++ 2_topo.html (revision 894) @@ -56,9 +56,11 @@ a detour to go around N2 clock-wise". To be able to determine which is the "first" crossing on N1, each two-net has one of its endpoint marked as the starting point. +

+Note: if there are more than 2 layers, each new layer adds 6 more possible +states using vias. -

2.3. Choosing between detour options

It is possible to draw a tree of the possible solutions. Each node of